The topic is short and compact
Goods produced to order are governed by sales law (§ 650 BGB); for defects arising from packaging or raw materials supplied by the brand itself, the brand has no defect rights against the manufacturer.
Between merchants, a batch is deemed approved if the brand fails to notify defects without delay (§ 377 HGB).
Payment terms beyond 60 days and inspection periods beyond 30 days are only effective if expressly agreed and not grossly unreasonable (§ 271a BGB).
The responsible person under Art. 4 of Regulation (EC) No 1223/2009 is the brand; the role can be transferred by written mandate.
Whoever puts their brand on the product is liable externally like a manufacturer (§ 4 ProdHaftG); recourse is governed by the contract.
So läuft die Entwicklung bei Labtree
1
Konzeptionierung
2
Bemusterung – Standardmuster in 24 h
3
Individualisierung
4
Prototyping
5
Produktion
White Label 2–3 Monate · Private Label 3–6 Monate · Produktion ab 1.000 Stück
Which law governs the contract with the contract manufacturer?
The typical contract between a cosmetics brand and a contract manufacturer is not a pure contract for work, but a contract for work and materials: the manufacturer owes the delivery of movable goods to be produced, in other words the manufactured batch. Under § 650 (1) BGB, the provisions on sales law apply to such contracts. For the brand, this means concretely: the defect rights are governed by sales law, and the transfer of risk takes place upon delivery of the goods, not through an acceptance procedure in the contract-for-work sense.
The difference is practically relevant. Under contract-for-work law, the focus would be a formal acceptance protocol with a formal inspection and acceptance deadlines. Under sales law, by contrast, what counts is what happens after delivery: the recipient must inspect the goods and give notice of defects, otherwise the goods are deemed approved (see section 2). Anyone who drafts the contract in contract-for-work language such as “acceptance” and “acceptance protocol” therefore creates an ambiguity precisely where rights are at stake in a dispute.
Even brands that bring in their own formulation or components remain within sales law: § 650 (1) BGB stipulates that § 442 (1) sentence 1 BGB also applies where the defect is attributable to material supplied by the customer. In practice this means: if a defect originates from packaging, pans, sticks or pre-products that the brand itself supplied, it cannot assert defect rights against the manufacturer on that basis. Supplied components should therefore be jointly inspected and released before production. Which documents and stability data a supplied formulation needs for production is covered in a separate article on cosmetics made to the brand's own formulation.
Name the contract type: a contract for work and materials covering the delivery of goods to be produced, not a contract for work.
Adjust the language: delivery, inspection and notice of defects instead of an acceptance protocol under contract-for-work law.
Expressly regulate supplied materials and packaging, because the brand has no defect rights for defects arising from its own supplies (§ 650 in conjunction with § 442 (1) sentence 1 BGB).
Include the inspection and notification procedure as a dedicated contractual clause rather than leaving it to general correspondence.
This classification does not replace legal advice in individual cases. It does, however, explain why the following sections do not deal with the down payment but with the incoming goods inspection and its deadlines: this is precisely where the applicable law defines the allocation of risk between brand and contract manufacturer.
Why is the incoming goods inspection more important than the down payment?
The down payment secures the manufacturer; the incoming goods inspection secures the brand. The basis is § 377 HGB: where the sale is a commercial transaction for both parties, the buyer must inspect the goods without undue delay after delivery, insofar as practicable in the ordinary course of business, and give immediate notice of any defect. If notice is omitted, the goods are deemed approved. For a cosmetics brand this means: if a batch with deviating viscosity, an incorrect shade level or damaged packaging is not notified in good time, the defect rights for that batch are generally lost.
The law distinguishes two points in time. Defects identifiable during the inspection must be reported immediately. Defects that only appear later and were not identifiable during the inspection must be notified without undue delay after discovery, otherwise the goods are deemed approved in this respect as well. To preserve the rights, timely dispatch of the notice suffices. The only exception: if the seller fraudulently concealed the defect, it cannot rely on these provisions.
Inspection step | What is inspected | Why the point matters |
|---|---|---|
Visual inspection | Integrity of carton, primary packaging and closure, transport damage | Obvious defects are immediately identifiable and must be reported immediately |
Batch number and quantity | Cross-check of delivery note, label and order, completeness of the delivery | Basis of batch documentation and traceability |
Labelling | Mandatory product information, batch designation, responsible person | Labelling errors are defects in the delivered goods |
Comparison with the released laboratory sample | Texture, colour, odour and application behaviour compared with the released reference | Detects deviations in sensorics and shade that a purely visual inspection misses |
Sampling | Fill volume, closure fit, workmanship, cleanliness of the filling | Reveals variations within the batch that remain invisible in the bulk container |
“Without undue delay” is indeterminate, and that is exactly where the risk lies. It is therefore advisable to agree a fixed notification deadline in days in the contract and to define the scope of inspection in writing, so that a dispute does not turn on the ordinary course of business. An inspection that documents when which sample was taken and with what finding it was filed also forms the basis for later recourse claims in the internal relationship.
Which payment terms and down payments are legally permissible?
Payment terms are negotiable, but not without limits. Under Section 271a(1) of the German Civil Code (BGB), an agreement under which the creditor may demand performance of a payment claim only more than 60 days after receipt of the counter-performance is valid only if it was expressly agreed and is not grossly inequitable in view of the creditor's interests. Applied to contract manufacturing: a payment term of more than 60 days for the production invoice requires an express clause, and even then it remains vulnerable if it places an unreasonable burden on the manufacturer.
A stricter threshold applies to inspection periods. Where the payment claim is to be performed only after inspection or acceptance of the counter-performance, an agreement under which the time for inspection or acceptance exceeds 30 days after receipt of the counter-performance is valid only if expressly agreed and not grossly inequitable (Section 271a(3) BGB). A long inspection period before payment is therefore not a given; it needs its own justification. If such a clause is invalid, the contract otherwise remains in force (Section 271a(4) BGB).
Down payments are excluded from this: Section 271a(5) BGB states that subsections (1) to (3) do not apply to agreements on advance payments and other instalment payments. Down payments and instalments therefore remain freely negotiable by contract. This explains why many manufacturers set up a payment schedule with instalments: it can be structured with legal flexibility, while the final payment term is bound to the 60-day limit.
Payment term over 60 days: only with an express clause and without gross inequity for the manufacturer (Section 271a(1) BGB).
Inspection period before payment: over 30 days only if expressly agreed and not grossly inequitable (Section 271a(3) BGB).
Advance and instalment payments: excluded from Section 271a BGB, freely negotiable (Section 271a(5) BGB).
Invalid clause: the contract otherwise remains in force (Section 271a(4) BGB).
How high the instalments and unit costs turn out in a given case depends on cost drivers that cannot be reduced to a formula: batch size, the effort for packaging and artwork, testing effort per batch and the share of individual development. Which items a reliable cost estimate must contain in order to make these drivers visible is covered in the guide to a cosmetic contract manufacturer's quotation.
Who is liable if a product causes damage?
Externally, the brand and the contract manufacturer are jointly liable. Under the German Product Liability Act (ProdHaftG), a manufacturer is, on the one hand, whoever actually produces the product (Section 4(1) sentence 1 ProdHaftG). On the other hand, anyone who presents themselves as the manufacturer by affixing their name, their trademark or another distinctive mark is also deemed to be the manufacturer (Section 4(1) sentence 2 ProdHaftG). A D2C brand that affixes its brand to skin tints, concealers, serums or creams produced by a contract manufacturer is therefore liable alongside the actual producer; both are liable as joint and several debtors (Section 5 ProdHaftG).
The liability itself is governed by Section 1(1) ProdHaftG: if a product defect kills someone, injures their body or health, or damages property, the manufacturer is obliged to pay compensation to the injured party, in the case of property damage under the conditions stated there. This liability is structured as strict liability towards the end consumer. The brand cannot shift it onto the contract manufacturer by pointing to them: the injured party can choose whom to turn to and will usually approach the party whose mark appears on the product.
Internally, the picture is different: here the brand can and should regulate recourse contractually. Three building blocks have proven effective, and all three rely on documentation that the manufacturer keeps anyway under good manufacturing practice.
Indemnification: the contract manufacturer indemnifies the brand against claims arising from a defect in production, filling or finishing.
Quality agreement: defined specifications, in-process controls and release responsibility, as provided for by good manufacturing practice under ISO 22716 for raw materials, release and production records.
Batch documentation obligations: every finished-product batch carries a batch number that can be assigned to the intermediate-product batch, so that in the event of damage, production records, raw material batches and test results can be traced.
Anyone who looks for this recourse line only once damage has occurred negotiates from a weak position. The agreement belongs in the contract before the first batch runs, together with the question of who bears the regulatory responsibility. That is the subject of the next section.
Who is the responsible person under the Cosmetics Regulation?
The responsible person is the regulatory counterpart to quasi-manufacturer status. Under Regulation (EC) No 1223/2009, only someone who has named a responsible person established in the EU may place a product on the market; a manufacturer within the meaning of the Regulation is anyone who places a cosmetic product on the market under their own name or their own brand. In contract manufacturing, that is the brand, not the contract manufacturer. The brand is therefore the responsible person under Art. 4 of the Regulation and may transfer the role to the contract manufacturer by written mandate.
The duties of the responsible person are extensive and must be fulfilled in documented form: notifying manufacture to the supervisory authority, submitting the cosmetic products to a notification system, and taking responsibility for the safety and legal compliance of the products placed on the market. The EU Cosmetics Regulation additionally requires that, before placing on the market, all cosmetic products be notified together with their formulation via the CPNP portal. Which steps the PIF, the safety report and the CPNP notification require in detail is covered in the article on the EU Cosmetics Regulation.
Product information file (PIF), kept at the responsible person's place of business and made accessible to the authorities on request.
Safety report prepared by a qualified safety assessor before the product is placed on the market.
CPNP notification before placing on the market, including the information for poison control centres and supervisory authorities.
Labelling with the mandatory product information, including the name and address of the responsible person on the product.
A clear distinction from the product liability discussed in the previous section is important: with the written mandate, the role of responsible person passes to the mandate holder together with its duties, but the external liability under the ProdHaftG does not. Even if the contract manufacturer acts as responsible person and handles the PIF, the safety report and the CPNP notification, the brand remains the one whose trademark is on the product and who is liable like a manufacturer under § 4 ProdHaftG. Both roles therefore belong in separate, each individually documented written arrangements.
What should be settled in writing before a project starts?
The previous sections lead to a short list of points that every contract draft with a contract manufacturer should contain. They can be taken directly into contract negotiations, and each point carries its own legal reference, so that in a dispute it is clear what it rests on.
Contract point | What is set down in writing | Legal reference |
|---|---|---|
Inspection scope and notification deadline per batch | Which inspection steps the brand performs itself (visual inspection, batch number, labelling, comparison with the laboratory sample, sampling), which the manufacturer documents, and by which day defects are notified | § 377 HGB |
Release process from laboratory sample to production batch | Named roles: who releases the laboratory sample, who the production batch, and which test results feed into the release | ISO 22716 as the reference for good manufacturing practice, cited in the contract |
Responsible person | Whether the brand holds the role itself or transfers it to the contract manufacturer by written mandate; who executes the PIF, the safety report and the CPNP notification | Art. 4 Regulation (EC) No 1223/2009 |
Recourse and indemnification | Indemnification of the brand in the event of manufacturing defects, quality agreement, documentation obligations for batch documentation | §§ 1, 4 ProdHaftG |
Payment term and inspection period | A payment term of over 60 days and an inspection period of over 30 days only as an explicit, justified clause; advance payments as a separate payment schedule | § 271a BGB |
Two of these points deserve a preliminary note at the process stage, not only in the contract: the inspection scope can only be defined if the enquiry to the contract manufacturer already specifies the product description, the packaging and the target markets precisely enough for specifications to be derived from them. What a robust enquiry must contain is covered in the guide on the enquiry to a cosmetic contract manufacturer. And the release roles can only be named if it was previously clear which questions to ask the contract manufacturer before signing.
This checklist does not replace a legal review of the individual case. It does, however, make visible where the law already prescribes the distribution of risk and where the contract only needs to add precision instead of inventing fundamentals.
Many of these points are easier to settle when formulation development, sampling and production sit in one hand. At Labtree, concept development, sampling, customisation, prototyping and production run in a single process. The role of responsible person remains with the brand; Labtree provides the regulatory documents such as the product information file and the safety report. Anyone who wants to start a cosmetics project will find the process on the cosmetics development page and can arrange an initial consultation there.
Quellen
More useful links
FAQ
What should be watched in contract negotiations when sales law applies?
For the negotiation itself: the language of the contract should be consistently based on sales law (delivery, inspection, notice of defects), because contract-for-work terms such as acceptance create ambiguities that work against the brand in a dispute. In practice, it is also worth explicitly designating the contract for work and materials as such and regulating supplied packaging and raw materials in a separate clause: for defects that stem from these supplied materials, the brand has no defect rights against the manufacturer under § 650 in conjunction with § 442 (1) sentence 1 BGB.
What happens if a defective batch is not reported in time?
The batch is deemed approved. Under § 377 HGB, a buyer for whom the purchase is a commercial transaction must inspect the goods immediately after delivery and report recognizable defects without delay. If the notice is omitted, the defect rights are lost. Exceptions: defects that were not recognizable during a proper inspection must be reported immediately after their discovery; in the case of fraudulently concealed defects, the seller cannot rely on the deadline.
Does the 60-day limit also apply to a payment plan with several instalments?
The limits apply only to the payment claim itself, i.e. the final payment term and the inspection period before it. Advance payments and instalments are expressly excluded under § 271a (5) BGB. A payment schedule with several instalments over the project duration is therefore freely negotiable, even if it extends over months; only the final instalment after delivery of the goods falls under the 60-day limit.
In the event of product damage, is the brand or the contract manufacturer liable?
Externally, both are liable. The contract manufacturer is liable as the actual producer, the brand as the so-called quasi-producer: anyone who presents themselves as the producer by attaching their name, trademark or other distinctive mark is also deemed a producer under § 4 ProdHaftG. Brand and contract manufacturer are liable as joint and several debtors, so the injured party can turn to either. How the costs are allocated internally is governed by the contract, for example through indemnification and quality agreements.
Can the brand transfer the role of responsible person?
Yes, via a written mandate. Under Art. 4 of Regulation (EC) No 1223/2009, the responsible person is in principle the producer, i.e. in contract manufacturing the brand that places the product on the market under its own name. The brand can transfer the role by written mandate to a person established in the EU, for example the contract manufacturer, who accepts the mandate in writing. With the mandate, the duties of the responsible person such as the PIF, the safety report and CPNP notification pass over; external liability under the ProdHaftG, however, remains with the brand.
What belongs in the incoming goods inspection of a cosmetics batch?
A defined, repeatable scope per batch: visual inspection of the products and packaging, comparison of batch number and quantity against the delivery note, checking of the labelling, sampling of fill quantity and workmanship, and comparison against the released laboratory sample, for example in terms of shade and texture. The inspection must be carried out immediately after delivery and documented so that the notice of defects under § 377 HGB can be sent in time.






